fbpx
Search anything by typing
North Vancouver, BC

St. Pius X Elementary School

10,000 sq ft23 Building ModulesMarch to September
Challenge
Challenge

Completing a school facility under an incredibly tight timeline

Metric Modular was required to provide an affordable, permanent school within 4 months of award; an incredibly aggressive timeline that would have been impossible to adhere to without using modular construction.

Solution
Solution

Bell Tower Entry and Rustic Timber Add Unique Features

The school consists of 23 factory pre-built modules, featuring offices, a staff room, a library, washrooms, seven classrooms, and a kindergarten.

The exterior features a bell tower and entry, and stucco finish with “Hardipanel Sierra – 4″ light-weight cement siding and wood trim. Exterior detailing includes 6″ x 6″ dentils above the windows.

Interior details include vinyl gyproc wall finish, an exposed open web truss ceiling to create a sense of space, carpet and Marmoleum flooring, and a central boiler with individual computer controlled room heating and ventilation units.

Metric Modular completed the foundations, plumbing manifolds, and electrical service connections and assisted with the coordination of other site services, parking, and sidewalks.

Start your Quote

Type
Size
Qty
Add More
Type
Size
Qty
Add More
  • This field is for validation purposes and should be left unchanged.